EPS Block Production in Aksu
- Project: production of EPS foamed concrete blocks
- Time: 5th April 2023
- Location: Aksu, Xinjiang, China
- Production output: 800m³ per day
Project outcome: The client utilized local mountain sand resources and provided their own facilities for sand crushing, ball milling, slurry storage, and measuring and conveying facilities. Installation was completed in two months, with commissioning and production training taking 20 days. The target output was achieved, and the products passed inspections, obtaining government certification.