Concrete Block Production in Sichuan
- Project: optimization and upgrading of foam concrete block production line by replacing circular saw cutter with high precision saw cutter
- Time: 15th November 2023
- Location: Bazhong, Sichuan, China
- Production output: 80-100m³ per day
After replacing the cutting machine, the client achieved a threefold increase in production capacity, meeting their requirements for various cutting sizes and reducing waste. The upgrade led to higher output with the same labor, significantly lowering costs, and the client was highly satisfied.
Get in Touch