EPS Block Production in Aral
- Project: production of homogeneous self-insulation concrete blocks
- Time: 12th March 2022
- Location: Aral, Xinjiang, China
- Production output: 500m³ per day
Project outcome: the production line adopted an environmentally friendly waste recycling process, utilizing stone powder resources to achieve resource recycling and reduce production costs. After the company's technical trainers completed the training, they were hired by the client for an extended period. The client was very satisfied with the equipment and product quality, reaching the production capacity of 500m³ per day with an annual output of 150,000m³.
Get in Touch